Wednesday, July 18, 2012

GOLDQUEST REPORTS ASSAY RESULTS FROM THE SECOND HOLE AT ROMERO, DOMINICAN REPUBLIC; INCLUDES 159 METRES GRADING 4.5 G/T GOLD AND 1% COPPER AND 24 METRES GRADING 7.5 G/T GOLD AND 0.9 % COPPER

July 18th 2012, Vancouver, British Columbia - GoldQuest Mining Corp. (TSXV: GQC) (“GoldQuest” or the “Company”) is pleased to announce the assay results of hole LTP 92, the second vertical hole into the Romero discovery, within the Company's 100% owned Las Tres Palmas trend in the Dominican Republic.

The location is 25 metres to the west and 4 metres lower in elevation than the discovery hole LTP 90, which returned 231 metres grading 2.4 grams per tonne (g/t) gold (see release of May 29th 2012). Hole LTP 92 displayed similar characteristics to hole LTP 90, with an upper gold unit from 28 metres below surface, with low copper and some zinc, followed by deeper, higher grade gold and copper horizons at depth.  The highlights of Hole LTP 92 were 159 metres grading 4.45 g/t gold from 212.5 metres to 372 metres, including a sub interval of 75.5 metres grading 9.01 g/t gold and 1.06% copper.  A higher horizon from 120 metres to 144 metres returned 24 metres grading 7.5 g/t gold and 0.86% copper. The hole was continued until the portable drill rig could drill no further and was terminated at 399 metres. Gold was present from 24 metres to the bottom of the hole, with certain horizons displaying enrichment in gold and base metals. 

"Results from hole LTP 92 are a significant addition to our understanding of the Romero mineralization, and extends at depth 138 metres below the initial discovery hole." commented Julio Espaillat, GoldQuest's CEO, "The two drill rigs have completed holes 93, 94 and 95 and drilling of 96 and 97 is in progress. Deep drilling with portable rigs is slower than normal, but is providing us valuable insight to the geometry of the deposit."

The potential quantity and grade of the mineralization is currently conceptual in nature, there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

The individual assay intervals from the complete hole can be reviewed on GoldQuest’s website at the below link.

http://www.goldquestcorp.com/pdf/news/LTP-92_AssayTable.pdf

The results and sub intervals are summarized in Table 1 below. The results reported have a bottom cut-off of 0.15 g/t gold. There is insufficient data to establish a specific top cut-off; however, in Table 1, an arbitrary top cut of 50 g/t gold has been used for the calculations, with the adjusted gold grade noted. (refer to the link below for information with respect to the location, elevation, azimuth and depth of the holes)

http://www.goldquestcorp.com/images/nr/NEWROMERO.jpg

 

Cut off 0.15ppm Au

From (m)

To (m)

Interval (m)

Au_ppm

Cu_%

Au_ppm (High value cut 50ppm)

28.2

82.0

53.8

0.63

0.02

0.63

120.0

144.0

24.0

7.50

0.86

6.88

212.5

372.0

159.5

4.45

0.95

4.14

Including

 

 

 

212.5

288.0

75.5

9.01

1.06

8.35

Including

 

 

 

243.9

288.0

44.1

15.03

1.43

13.9

Including

 

 

 

320.0

346.0

26.0

0.54

2.04

0.54

 

 

 

 

 

 

 

As part of the Company's Quality Assurance and Quality Control procedures (QA/QC), most of the high grade intervals have been re-assayed and the Company is awaiting these check samples. In addition, systematic re-assaying of intervals is in progress, to confirm compliance of blanks and duplicates checks. Cross sections and correlation between these and other holes will be published once assays from other holes are reported. 

In GoldQuest´s drill programs, composite intervals were chosen using a combination of geological criteria and mineralization, averaging around 2 metres core length. The drill core is cut in half with one half of the core sample shipped to ACME Labs by GoldQuest technicians. The remaining half of the core is kept at the company core shack for future assay verification, or any further investigation. Intervals below a bottom cut-off grade of 0.15 g/t Au were calculated at zero gold. All drill samples were prepared and screened by ACME Labs (Santo Domingo); metallic fire assay and multi-element ICP-MS, were assayed by ACME Analytical Laboratories (Chile). Gold values are determined by standard fire assay of a 50 gram charge with an AA finish, or if over 10.0 g/t Au, were re-assayed and completed with a gravimetric finish. QA/QC included the insertion and continual monitoring of numerous standards, blanks and duplicates into the sample stream, at random intervals within each batch. The comprehensive GoldQuest Quality Assurance and Quality Control protocols can be viewed on GoldQuest’s website at:http://goldquestcorp.com/index.php/corporate/corporate-governance

The information in this press release has been reviewed and approved by Mr. William Fisher, P. Geo., a qualified person for the technical information in this press release under NI 43-101 standards and the chairman and a director of GoldQuest Mining Corp.

To view the entire press release follow the link below:

July 18, 2012 (Source: GoldQuest Mining Corp.)

http://www.goldquestcorp.com/index.php/news/2012-news/164-goldquest-reports-assay-results-from-the-second-hole-at-romero-dominican-republic-includes-159-metres-grading-4-5-g-t-gold-and-1-copper-and-24-metres-grading-7-5-g-t-gold-and-0-9-copper

Disclosure:  GoldQuest Mining Corp. is a Vulture Bargain Candidate of Interest (VBCI).  Members of the GGR team are actively accumulating and hold long positions in GWC.V.   


Comments

Subscribe to GGR


GGR Sponsors


Affiliates


Buy gold online - quickly, safely and at low prices